|
|
 |
| |
 |
| |
Highlights:
-
Earthquake
resistant
construction,
Only
14
flats,
2
flats
per
floor,
24
hrs
security,
generator
backup
for
lifts
and
emergency
points
for
flats,
double
cavity
walls
on
exterior
for
heat
and
sound
insulation,
Covered
car
parking.
Structure:
Super
Structure:
Flooring:
-
Vitrified
tile
flooring
for
living,
dining
rooms,
staircase
and
lobby.
Superior
quality
ceramic
tiles
for
other
rooms
and
toilets.
Toilet
and
Fittings:
Antiskid
Tiles
Floors,
Glazed
Ceramic
Tiled
wall
dado
150
cms
high,
White
Coloured
Sanitaryware,
PVC
frame
and
shutter
for
doors,
18
cm
diameter
wash
basin.
CP
plumbing
fixtures
of
reputed
brand.
Provision
for
exhaust
fan
and
Geyser.
Kitchen:
Painting:
-
Putty
finished
interiors
in
living
and
dining
with
two-coat
emulsion,
cement
paint
(snowcem
or
equivalent)
for
exteriors,
enamel
paint
on
doors,
windows,
grills
&
hand
rails.
Door
/
Door
Frames
/
Windows
/
Ventilators:
Flush
doors
and
frames
of
hard
wood.
All
windows
and
ventilators
shall
be
of
good
quality
hard
wood
or
good
quality
aluminium
with
glazed
sliding
or
opening
type,
with
suitable
fittings.
All
windows
shall
be
provided
with
suitable
iron
guard
/
grills
and
painted
suitably.
Electrical:
-
All
electrical
lines
shall
be
concealed
conduit
copper
wiring
with
semi
modular
switch/socket/plugs
provided.
Provision
for
separate
meters
for
all
flats,
with
necessary
panel
boards
and
fittings.
All
materials
used
shall
be
of
ISI
branded.
Selection
of
brand
names
are
the
discretion
of
the
builders.
Plumbing:
-
All
water
lines
provided
are
concealed
hot,
and
cold
water
pipe
lines
on
bathrooms
wherever
specified
in
drawing
.
Pure
ground
water
connection
shall
be
available.
Water
connection
lines
are
provided
for
each
flats,
from
the
over
head
water
tanks
for
sufficient
flow
of
water.
Heavy
grade
PVC
pipes
are
used
for
cold
water
connections
and
GI
pipes
for
hot
water
lines
wherever
specified.
General:
-
Septic
tank,
soak
pits
and
dispersion
trenches
will
be
provided
as
per
requirement
and
suitable
connections
from
each
toilets
&
bathrooms
and
kitchen
outlets.
The
information
provided
is
based
on
the
availability
of
materials
and
the
builders
shall
substitute
with
equal
quality
of
materials
if
not
available
at
the
time
of
construction.
|
| |
|
| |
|
|